Pete, what's the very latest on this. Anything to report? Have you identified how the fans will be involved? etc
Still searching for the Young Soul Rebels
https://www.youtube.com/watch?v=5mYxZUJt4xc
https://www.youtube.com/watch?v=5mYxZUJt4xc
-
bigmac95
- Bronze Member
- Posts: 950
- Joined: Fri Nov 05, 2010 4:06 pm
- Location: Newcastle upon Tyne
- Contact:
Re: Ground development steering group
I must admit i was wondering about this, and when work was planned to start?
And on the 7th day god created football
Re: Ground development steering group
I was concerned that the last Pete said about it was something along the lines of "it'll happen in it's own time" which suggested to me that nobody was looking at it - certainly not urgently anyways. Things like this don't happen unless someone is committed to pushing constantly. imho of course.
-
Roadrunner
- Bronze Member
- Posts: 764
- Joined: Sat Dec 17, 2011 10:16 pm
- Contact:
Re: Ground development steering group
At the meeting in the Cross Bar PC said
1. The Steering Group would be made up from volunteer fans
2. The Group would have to sign confidentialty agreements
3. The Group would review the 3 or more sets of architects designs
4. The Group would comment on the designs
5. When these designs are back PC would choose his preferred architects
Last thing I heard was the architects have been chosen already, doesn't seem any point in 1 to 4 now
Done deal
1. The Steering Group would be made up from volunteer fans
2. The Group would have to sign confidentialty agreements
3. The Group would review the 3 or more sets of architects designs
4. The Group would comment on the designs
5. When these designs are back PC would choose his preferred architects
Last thing I heard was the architects have been chosen already, doesn't seem any point in 1 to 4 now
Done deal
We're all supporters on here. Let's leave the negative comments to the away fans
-
boyliegladbach
- BarrowAFC Veteran
- Posts: 8713
- Joined: Sun Aug 01, 2010 10:07 am
- Location: Tel aviv
- Contact:
Re: Ground development steering group
I thought he said he was choosing best of 3 architects. Then steps one to four as you put above.Roadrunner wrote:At the meeting in the Cross Bar PC said
1. The Steering Group would be made up from volunteer fans
2. The Group would have to sign confidentialty agreements
3. The Group would review the 3 or more sets of architects designs
4. The Group would comment on the designs
5. When these designs are back PC would choose his preferred architects
Last thing I heard was the architects have been chosen already, doesn't seem any point in 1 to 4 now
Done deal
- Uncle Peter
- Platinum Member
- Posts: 3371
- Joined: Wed May 28, 2008 7:17 pm
- Location: Barrow
- Contact:
Re: Ground development steering group
Thats pretty much spot on. The architects have been chosen and are currently working on some concepts. The ground steering group hasn't gone away, and as soon as their is something to work with i'll be in touch. They will then meet with the architect and give feedback and ideas on different things.boyliegladbach wrote:I thought he said he was choosing best of 3 architects. Then steps one to four as you put above.Roadrunner wrote:At the meeting in the Cross Bar PC said
1. The Steering Group would be made up from volunteer fans
2. The Group would have to sign confidentialty agreements
3. The Group would review the 3 or more sets of architects designs
4. The Group would comment on the designs
5. When these designs are back PC would choose his preferred architects
Last thing I heard was the architects have been chosen already, doesn't seem any point in 1 to 4 now
Done deal
"As long as they don't start causing any bother they are welcome to continue reinforcing my belief the Midlands is only good for nuking."
Mr R Ingham, 02/10/2013
Mr R Ingham, 02/10/2013
-
mickmike wilson
- BarrowAFC Veteran
- Posts: 5428
- Joined: Thu May 29, 2008 2:56 pm
- Location: The live music capital of the world, AUSTIN, TEXAS
- Contact:
Re: Ground development steering group
Any idea when the Steering group of fans will be selected? My postie has threatened to put in an official complaint as I jump out on him on a daily basis, I'm worse than the cities dogs he saysUncle Peter wrote:Thats pretty much spot on. The architects have been chosen and are currently working on some concepts. The ground steering group hasn't gone away, and as soon as their is something to work with i'll be in touch. They will then meet with the architect and give feedback and ideas on different things.boyliegladbach wrote: I thought he said he was choosing best of 3 architects. Then steps one to four as you put above.
- Uncle Peter
- Platinum Member
- Posts: 3371
- Joined: Wed May 28, 2008 7:17 pm
- Location: Barrow
- Contact:
To be honest I'm not sure Mike. There are various different things to finalise but as soon as it's ready to move on I'll be on touch with everyone
"As long as they don't start causing any bother they are welcome to continue reinforcing my belief the Midlands is only good for nuking."
Mr R Ingham, 02/10/2013
Mr R Ingham, 02/10/2013
Re:
Peter, Just wondering if you know at what stage the redevelopment designs are. Initial thoughts from Mr Casson were, correct me if i'm wrong, designs to be finalised in the spring, shown to fans, and then inputted for planning permission.Uncle Peter wrote:To be honest I'm not sure Mike. There are various different things to finalise but as soon as it's ready to move on I'll be on touch with everyone
Knowing how long planning departments take, re-building prob wont start for another year !!!!!
-
blue nige
- BarrowAFC Veteran
- Posts: 6922
- Joined: Mon Jan 07, 2013 7:21 pm
- Location: Antarctica
- Contact:
Re: Re:
you are probably right we still haven`t chosen the group!.the timescale (if it`s as been stated at the meeting with paul casson) ) just wouldn`t allow reasonable debate/consultation to take place!Paul wrote:Peter, Just wondering if you know at what stage the redevelopment designs are. Initial thoughts from Mr Casson were, correct me if i'm wrong, designs to be finalised in the spring, shown to fans, and then inputted for planning permission.Uncle Peter wrote:To be honest I'm not sure Mike. There are various different things to finalise but as soon as it's ready to move on I'll be on touch with everyone
Knowing how long planning departments take, re-building prob wont start for another year !!!!!
if it can`t been done then lets just let everyone know,it`s not perfect but if we have to wait so be it!
- Uncle Peter
- Platinum Member
- Posts: 3371
- Joined: Wed May 28, 2008 7:17 pm
- Location: Barrow
- Contact:
Right, I have news!
Paul is over mid march so over the next few days I will be putting the list of all interested parties with a view to contacting them and arranging a group meeting.
I appreciate this is taking longer than we expected but this is going to be a long process. We only get one shot at getting this right so please bear with us.
Paul is over mid march so over the next few days I will be putting the list of all interested parties with a view to contacting them and arranging a group meeting.
I appreciate this is taking longer than we expected but this is going to be a long process. We only get one shot at getting this right so please bear with us.
"As long as they don't start causing any bother they are welcome to continue reinforcing my belief the Midlands is only good for nuking."
Mr R Ingham, 02/10/2013
Mr R Ingham, 02/10/2013
Re:
Thanks for the update Peter.Uncle Peter wrote:Right, I have news!
Paul is over mid march so over the next few days I will be putting the list of all interested parties with a view to contacting them and arranging a group meeting.
I appreciate this is taking longer than we expected but this is going to be a long process. We only get one shot at getting this right so please bear with us.
Will the group be meeting to review the Architect's latest designs ?
Re: Ground development steering group
Not having a dig but I thought the idea was to build the first new stand this summer? Maybee I understood wrongly. Can't see any way they will finalise the plans and get planning permission in time to do this.
Maybe this summer it is the pitch and the floodlights and building to start in 2016.
Can someone clarify the plan please?
Maybe this summer it is the pitch and the floodlights and building to start in 2016.
Can someone clarify the plan please?
Re: Ground development steering group
That's the way I understood it it as well.Anyway,when the new stands do go up can we have them free of those annoying uprights that get in your eye-line such as on the Wilkie Stand.DaveP wrote:Not having a dig but I thought the idea was to build the first new stand this summer? Maybee I understood wrongly. Can't see any way they will finalise the plans and get planning permission in time to do this.
Maybe this summer it is the pitch and the floodlights and building to start in 2016.
Can someone clarify the plan please?
Re: Ground development steering group
Pitch / floodlights first. Stand developments will most certainly go into the football season and put that part of the ground out of action. Like when current Main Stand was being built.
Still searching for the Young Soul Rebels
https://www.youtube.com/watch?v=5mYxZUJt4xc
https://www.youtube.com/watch?v=5mYxZUJt4xc
Who is online
Users browsing this forum: No registered users and 19 guests