pitch work has now started.
-
Bingo
- Platinum Member
- Posts: 4102
- Joined: Fri Jun 06, 2008 12:43 am
- Location: Failsworth, Manchester
- Contact:
Re: pitch work has now started.
It's starting to look really good -
If ours isn't ready others won't be either - lots of teams do this in the close season and considering work started sometime ago and we don't have a game on it for another 5 weeks yet I am sure it will be fine
If ours isn't ready others won't be either - lots of teams do this in the close season and considering work started sometime ago and we don't have a game on it for another 5 weeks yet I am sure it will be fine
Re: pitch work has now started.
pitch is looking really nice. some way togo B4 season start so we swhould have a playing surface worth playing on...for the players that is. and worth watching from the terraces etc 
-
GTBLUE
- BarrowAFC Veteran
- Posts: 5238
- Joined: Wed May 28, 2008 5:27 pm
- Location: WHEN WE HAD A ROOF
- Contact:
Re: pitch work has now started.
It will also help the better footballing side as well, which could be a bit worrying.
- spirit of 1990
- BarrowAFC Veteran
- Posts: 9885
- Joined: Sat Feb 13, 2010 10:50 am
- Contact:
Re: pitch work has now started.
Not much point in taking a photo today as it looks pretty much the same from a distance, it's only when you stand above it you can see all the little patches that were bare starting to close up & knit together now.
Looking good though.
Looking good though.
We didn't underestimate them, we just didn't think they were that good.
Re: pitch work has now started.
Pete, any news from the club on the ground development yet ??
-
blue nige
- BarrowAFC Veteran
- Posts: 7150
- Joined: Mon Jan 07, 2013 7:21 pm
- Location: Antarctica
- Contact:
Re: pitch work has now started.
Think this has been put on the back burner because the steering group has not even been formed can`t see it being any earlier than this mid -season.Paul wrote:Pete, any news from the club on the ground development yet ??
-
Lancaster Branch
- BarrowAFC Veteran
- Posts: 5509
- Joined: Sun Jun 15, 2008 10:15 pm
- Contact:
Re: pitch work has now started.
There were architects/designers at the ground this week, apparently.
- Steeley
- BarrowAFC Veteran
- Posts: 5750
- Joined: Wed May 28, 2008 4:27 pm
- Location: Manchester
- Contact:
Re: pitch work has now started.
Same ones that did Fleetwoods?Lancaster Branch wrote:There were architects/designers at the ground this week, apparently.
Bish=God
- The Real Slim Azza
- BarrowAFC Veteran
- Posts: 6941
- Joined: Thu Jan 01, 2009 2:07 pm
- Contact:
Re: pitch work has now started.
I may be incorrect in what im saying but this steering group thing was announced over a year ago wasn't it?blue nige wrote:Think this has been put on the back burner because the steering group has not even been formed can`t see it being any earlier than this mid -season.Paul wrote:Pete, any news from the club on the ground development yet ??
Why hasn't anyone been put in place yet?
Taurus excreta cerebrum vincit
BIG BADGE MISTAKE POLOS
END OF POST
BIG BADGE MISTAKE POLOS
END OF POST
-
Lancaster Branch
- BarrowAFC Veteran
- Posts: 5509
- Joined: Sun Jun 15, 2008 10:15 pm
- Contact:
Re: pitch work has now started.
Steeley wrote:Same ones that did Fleetwoods?Lancaster Branch wrote:There were architects/designers at the ground this week, apparently.
-
blue nige
- BarrowAFC Veteran
- Posts: 7150
- Joined: Mon Jan 07, 2013 7:21 pm
- Location: Antarctica
- Contact:
Re: pitch work has now started.
If that's right then I don't understand what's going on because we were told the architects had been chosen and there would be 3designs and it would be used as a starting point and changes made to suit!Lancaster Branch wrote:There were architects/designers at the ground this week, apparently.
- Uncle Peter
- Platinum Member
- Posts: 3371
- Joined: Wed May 28, 2008 7:17 pm
- Location: Barrow
- Contact:
Re: RE: Re: pitch work has now started.
That is still correct. Paul is meeting with the Architects, project managers and other people whilst he's over this week.blue nige wrote:If that's right then I don't understand what's going on because we were told the architects had been chosen and there would be 3designs and it would be used as a starting point and changes made to suit!Lancaster Branch wrote:There were architects/designers at the ground this week, apparently.
The Ground Group is still happening, and the main sticking point at present is what land we have to play with. I believe that's the basis of his meetings this week.
Sent from my D6603 using Tapatalk
"As long as they don't start causing any bother they are welcome to continue reinforcing my belief the Midlands is only good for nuking."
Mr R Ingham, 02/10/2013
Mr R Ingham, 02/10/2013
Re: pitch work has now started.
The longer this goes on without actually seeing any designs, the more I believe the existing ground is readily upgradable without a total rebuild. Have the existing Main stand expanded to the full length of pitch (2000), The Pop side to remain as a large terraced paddock with the missing terracing replaced back down to pitch side (2000), the HSE re-roofed on top of existing terrace (2000)- (if this can be done somehow) and a seated stand (similar to main stand) behind the Crossbar end (1500) with all the hospitality- and returned as the away end. This would give us a traditional / modernised ground that I'm sure would appease most fan groups. I personally wouldn't want the same mainstand as Fleetwood. No curved roofs for me and stands clinically separated from each other and far back from pitchside. And still hope they continue with refurbing the floodlight pylons.
Still searching for the Young Soul Rebels
https://www.youtube.com/watch?v=5mYxZUJt4xc
https://www.youtube.com/watch?v=5mYxZUJt4xc
Re: RE: Re: pitch work has now started.
"We can just build around it"Uncle Peter wrote:That is still correct. Paul is meeting with the Architects, project managers and other people whilst he's over this week.blue nige wrote: If that's right then I don't understand what's going on because we were told the architects had been chosen and there would be 3designs and it would be used as a starting point and changes made to suit!
The Ground Group is still happening, and the main sticking point at present is what land we have to play with. I believe that's the basis of his meetings this week.
Sent from my D6603 using Tapatalk
-
Lancaster Branch
- BarrowAFC Veteran
- Posts: 5509
- Joined: Sun Jun 15, 2008 10:15 pm
- Contact:
Re: pitch work has now started.
How is any of that incompatible with architects/designers being at the ground this week?blue nige wrote:If that's right then I don't understand what's going on because we were told the architects had been chosen and there would be 3designs and it would be used as a starting point and changes made to suit!Lancaster Branch wrote:There were architects/designers at the ground this week, apparently.